Deposit ID | 10134130 |
---|---|
MAS/MILS ID | 4790250001 |
Record type | Site |
Current site name | No Other Known Name. |
Alternate or previous names | Bor |
Point of reference | Ore Body |
---|---|
Geographic coordinates: | 22.10189, 44.08197 (WGS84) |
Elevation | 450 |
Location accuracy | 10000(meters) |
(click for info) |
Country |
---|
Serbia |
Commodity | Importance |
---|---|
Copper | Primary |
Gold | Secondary |
Silver | Secondary |
Ore Body (1) | 22.10189, 44.08197 |
---|
Strike | N45W | ||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Dip | 60S | ||||||||||||||||||||||||||||||
Width | 1200M | ||||||||||||||||||||||||||||||
Length | 5000M | ||||||||||||||||||||||||||||||
|
Operation type | Surface-Underground |
---|---|
Development status | Producer |
Commodity type | Metallic |
Significant | Yes |
Year of first production | 1967 |
Milling method | Flotation |
Type of mineral rights | Unknown |
---|
Type | Owner-Operator |
---|---|
Owner | Rudarsko Topionicarski Basen (Rtb) Bor. |
Interest | 100 |
Home office | Yugoslavia |
Year | 1990 |
Year | 1985 |
---|---|
Accuracy | Estimate |
Description | Ore Throughput (Estimated) 4041000 Metric Tons Of Ore. |
Year | 1986 |
---|---|
Period | 1965-1986 |
Accuracy | Estimate |
Description | Approximate Ore Mined 1965-1986 4500000 Metric Tons Per Year |
Year | 1986 |
---|---|
Accuracy | Estimate |
Description | Ore Throughput (Estimated) 4205000 Metric Tons Of Ore. |
Year | 1987 |
---|---|
Accuracy | Estimate |
Description | Ore Throughput (Estimated) 4164000 Metric Tons Of Ore. |
Year | 1988 |
---|---|
Accuracy | Estimate |
Description | Ore Throughput (Estimated) 4519000 Metric Tons Of Ore. |
Type | In-situ | ||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Estimate year | 1989 | ||||||||||||||
Inferred | 60,000,000mt ore | ||||||||||||||
Total resources | 60,000,000mt ore | ||||||||||||||
|
Type of workings | Surface | ||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Area | 600HA | ||||||||||||||||||||||||||||
|
Type of workings | Underground | ||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Type of workings | Underground | ||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Agency | Database name | Acronym | Record ID | Notes |
---|---|---|---|---|
U.S. Bureau of Mines | Minerals Availability System | MAS | 4790250001 |
YUGOSLAVIA'S METAL WITH A FUTURE. DEC., 1979. META BULLETIN
YUGOSLAVIA'S METAL WITH A FUTURE. DEC 1979. META BULLETIN
MONTHLY.
DEPOSIT PROFILE RTB BOR, YUGOSLAVIA. BOR MINE, MADJANPEK
MINE, AND VELIKI KRIVELJ MINE. PARTS I AND II.
SEPT. 1980. GOLDER ASSOCIATES, INC.
MINING MAGAZINE, DEVELOPMENTS IN THE BOR BASIN, YUGOSLAVIA,
1971, P. 222.
ENGINEERING AND MINING JOURNAL, COPPER INDUSTRY GIANT
PLANNED IN YUGOSLAVIA, APRIL 1971, P. 32.
JEREMIE, M.L., A CASE HISTORY OF GROUND BEHAVIOR IN
TRANSVERSE CUT-AND-FILL MINING AT CHOKA DULKAN, BOR
COPPER MINE, YUGOSLAVIA, MINING ENGINEERING, APRIL 1978,
PP. 374-378.
WWORLD MINING, DECEMBER 1979, P. 11.
MINING MAGAZINE, ...AS BOR CLOSES, APRIL 1981, P. 290.
WORLD MINING, MARCH 1982, P. 87.
LEWIS, ALVIN, YUGOSLAVIA'S "RTB BOR" COPPER COMBINE, IN
ENGINEERING AND MINING JOURNAL, OCTOBER 1983, PP. 70-74.
MINING JOURNAL, YUGOSLAV MINING INDUSTRY, AUGUST 12, 1988,
P. 126.
COMMODITIES RESEARCH UNIT LIMITED, LONDON, THE BASE
METAL INDUSTRIES OF EASTERN EUROPE, VOL. 3, PP. 139-40
(NOV. 1990).
Subject category | Comment text |
---|---|
Deposit | IN TYPE OF ORE BODY, "OTHER" IS MASSIVE. |
Type | Date | Name | Affiliation | Comment |
---|---|---|---|---|
Reporter | 10-MAR-1997 | Porter, Kenneth E. | U.S. Bureau of Mines |